Just In Time In Construction (JIT Delivery)

Posted by NEHP on Oct 11, 2018 11:49:55 AM

Eliminate Inventory Waste and More with Just In Time Construction Delivery

JIT Delivery, or just in time in construction, is an inventory management approach designed to eliminate waste by "receiving goods only as they [are needed] for production processes." [1]  While JIT delivery is most often correlated with combating the issue of inventory waste, it is also perfectly applicable to the elimination of D.O.W.N.T.I.M.E and all of the 8 wastes of lean construction

In construction processes, inventory waste is generally the result of unnecessary stockpiling of materials due to over-estimating and over-ordering. But it can also include and lead to the unnecessary use of said materials, thus translating to a whole host of wasted effort, time, and material.

Read More

Topics: construction productivity, lean construction

Helpful Tips for Long Lead Construction Planning

Posted by NEHP on Aug 30, 2018 3:14:00 PM

How to ensure Successful Long Lead construction Planning

A common risk (and constraint) to construction project schedules is the availability of project materials. Project materials can include anything from building materials, to office supplies, to tools, equipment needs, and even personnel.

Often times construction firms must procure materials and services from various suppliers who do not work in unison, but rather have multiple commitments of their own to complete and varying deadlines to complete them under.

All of these puzzle pieces must be carefully planned and aligned to keep construction deliverables flowing, schedules intact, and project costs in check. 

Read More

Topics: construction productivity, lean construction, construction planning

Bringing Continuous Improvement to the Construction Industry

Posted by NEHP on Aug 27, 2018 4:09:53 PM

Continuous Improvement is Key to the New Era of Construction Productivity

Over the last 50 years many businesses in the manufacturing industry have dramatically improved their production protocols. Those businesses have achieved strong results by adapting methods from the Toyota Production System (TPS). The core tenet of TPS is to eliminate waste and improve efficiency, thereby earning the system the general name of 'lean' manufacturing.

Now, more and more industries are finding useful applications of 'lean' within their own productivity agendas.

Read More

Topics: value stream mapping, construction productivity, lean construction

Last Planner System (LPS) and the Construction Industry

Posted by NEHP on Aug 24, 2018 1:30:00 PM

What is the Last Planner System and How Does it Work?

The Last Planner System (LPS) is a workflow method developed by the Lean Construction Institute to increase worker productivity and accountability through tight scheduling and detailed group planning.

Last Planner is seen as a managerial approach on how to efficiently run a construction project. The guiding principle of the system is to ensure that each contractor and subcontractor on a construction site can manage their workload, while holding them responsible for the work they promised to complete.

Read More

Topics: construction productivity, lean construction

8 Wastes of Lean Construction Part 2: Overproduction

Posted by NEHP on Jun 1, 2018 12:39:51 PM

OverComing Overproduction

Overproduction is defined as any type of production that is more than needed or before it's needed. It can result in excess inventory and it consumes time, effort, money, materials and resources that could have otherwise been spent more effectively elsewhere.

With regard to construction productivity, modular off-site fabrication can help combat overproduction waste on large-scale process utility projects.

Read More

Topics: 8 wastes of lean, overproduction, lean construction