title: Just In Time In Construction (JIT Delivery)
description: JIT delivery, or Just In Time in construction, is a valuable method for eliminating inventory waste from the 8 wastes of lean construction.
image: https://blog.cpsgrp.com/hubfs/pexels-photo-544965.jpg
---

[![Exential_logo_white_cmyk_MoSo (1)](https://blog.cpsgrp.com/hs-fs/hubfs/CPSGrp_Feb2017/_Home/1%20company%20brand%20elements/NEHP/Exential_logo_white_cmyk_MoSo%20(1).png?width=133&height=44&name=Exential_logo_white_cmyk_MoSo%20(1).png "Exential_logo_white_cmyk_MoSo (1)")](https://www.exentec.net/Services-Overview/Modular-Solutions)

- [Services](https://www.exentec.net/Services-Overview/Modular-Solutions) 
    - [Large-scale Modularization](https://www.exentec.net/Services-Overview/Modular-Solutions/Large-Scale-Modularization)
    - [Engineered Productivity Solutions](https://www.exentec.net/Services-Overview/Modular-Solutions/Engineered-Productivity-Solutions)
    - [ATF Equipment Utility Modules](https://www.exentec.net/Services-Overview/Modular-Solutions/ATF-Equipment-Modules)
- [Blog](https://blog.cpsgrp.com/nehp)

# Exential Modular Solutions

## Just In Time In Construction (JIT Delivery)

Posted by [NEHP](https://blog.cpsgrp.com/nehp/author/nehp) on Oct 11, 2018 11:49:55 AM

### **Eliminate Inventory Waste and More with Just In Time Construction Delivery**

JIT Delivery, or just in time in construction, is an inventory management approach designed to eliminate waste by "receiving goods only as they \[are needed\] for production processes." [\[1\]](https://www.investopedia.com/terms/j/jit.asp)  While JIT delivery is most often correlated with combating the issue of **inventory** **waste,** it is also perfectly applicable to the elimination of D.O.W.N.T.I.M.E and all of the [8 wastes of lean construction](https://blog.cpsgrp.com/nehp/eliminating-the-8-wastes-of-lean-part-1-defects). 

In construction processes, inventory waste is generally the result of unnecessary stockpiling of materials due to over-estimating and over-ordering. But it can also include and lead to the unnecessary **use** of said materials, thus translating to a whole host of wasted effort, time, and material.

![JIT Supply Chain Management](https://blog.cpsgrp.com/hs-fs/hubfs/pexels-photo-544965.jpg?width=1050&name=pexels-photo-544965.jpg)

The concept of just in time in construction is derived from the Toyota company’s revolutionary system of lean manufacturing; where production input is determined on the basis of actual demand. As with many factory-based lean manufacturing principles, JIT delivery is becoming increasingly assimilated into [lean construction](https://info.cpsgrp.com/lean-construction-integration) methodologies.

In a construction scheduling context, JIT requires alignment and balance between project items that are considered ["long lead"](https://blog.cpsgrp.com/nehp/long-lead-planning-and-construction-productivity) and those that are more readily available. As a result, specialized Supply Chain Management (SCM) personnel are required for ensuring that **all** materials are present and readily available when needed. This means that theSCM must factor lead times into the process, creating a system where materials are pulled, rather than pushed through the process. 

*Estimating material needs and "pushing" them through a project is inefficient and prone to error, often resulting in wasted effort, time, money, and supplies.*

The JIT method also requires that suppliers and contractors collaborate at a higher level than in regular construction methods and it requires that all project supplies are up to standard. This helps to prevent project delays due to unusable materials and helps to ensure that contractors deliver a higher quality product with reduced defects and maintenance needs over the life of the product.

As you can see, with proper implementation, the Just In Time method will not only eliminate inventory waste, but will promote project alignment, unity and forethought which in turn helps to combat all of the 8 wastes of lean construction (as shown by the **D.O.W.N.T.I.M.E**. acronym below):

1. **D**efects
2. **O**verproduction
3. **W**aiting
4. **N**on-Utilized Talent / Resources
5. **T**ransportation
6. **I**nventory Excess
7. **M**otion Excess
8. **E**xtra Processing

In the end, this will result in happier employees, more satisfied customers and smoother operations across the board.

With some reports indicating that 90% of the world’s infrastructure projects run over-budget and over-schedule [\[2\]](https://www.economist.com/business/2017/08/17/efficiency-eludes-the-construction-industry) it becomes clear that an overhaul is needed in the planning, execution, and mindset of construction management.

The Just In Time delivery method can assist with this overhaul and is a powerful tool for improving construction productivity. Any construction firm that fully understands a project’s needs, and knows it can meet expectations on time and within budget is immediately far ahead of the industry curve. 

**If you would like more information about construction productivity improvement, please feel free to access our large-scale modularization fact sheet below:**

**[![Large-scale Modularization Discovery Call CTA](https://blog.cpsgrp.com/hs-fs/hubfs/hub_generated/resized/2a1dd1dd-3906-4807-b905-ba456373d07c.png?width=509&height=269&name=2a1dd1dd-3906-4807-b905-ba456373d07c.png)](https://cta-service-cms2.hubspot.com/ctas/v2/public/cs/c/?cta_guid=e2d699e4-f69f-4b30-b8c4-5d52052dfa16&placement_guid=7d7d32a1-ddb0-463d-9057-55579e016290&portal_id=2835452&canon=https%3A%2F%2Fblog.cpsgrp.com%2Fnehp%2Fconstruction-kpi-types&redirect_url=APefjpFEDzel6wvYxyPoK1jccHxqh3LSAAJ8EFFEfMeIpxHkWjRSGPdL-kuTyRQr8mWYoSHCUSeW5OXRIYVdC-4HvL0oohpqQXH0mV33IQBrSNqe3jmxe3Ei2tVBqpixEs9XX9a_Cv8zRHQT45-BzEZQzy1dOMgGW69rhV4fYYYez2Gpz1BOefcZ42GG0GFLp98rEyYtq0CaYzSOvQ9l7D7LRxi6Hlc2nooPSU-Msf9q6PRHJcNwmkFUSfhkLgRHu0ayQTC02v8zP0VNqmezILJKtO6NoL7YwuEHFPFE89LBRx5rExOmlyWnh8LCzPRW353EeykS8FUT&click=cfe5603a-d624-483a-8634-29ff59026448&hsutk=e8c12a3007963996d38903b0d99e5216&utm_referrer=https%3A%2F%2Fblog.cpsgrp.com%2Fnehp&pageId=5958288477&__hstc=120297175.e8c12a3007963996d38903b0d99e5216.1490876416085.1534778279384.1534866846191.1014&__hssc=120297175.2.1534866846191&__hsfp=1476438118)**

**OR**

[**Visit Our Lean Construction Integration Page Here**](https://info.cpsgrp.com/lean-construction-integration)

---

Sources:

\[1\] https://www.investopedia.com/terms/j/jit.asp

\[2\] https://www.economist.com/business/2017/08/17/efficiency-eludes-the-construction-industry

Topics: [construction productivity](https://blog.cpsgrp.com/nehp/topic/construction-productivity), [lean construction](https://blog.cpsgrp.com/nehp/topic/lean-construction)

[![Large-scale Modularization Discovery Call CTA](https://no-cache.hubspot.com/cta/default/2835452/7d7d32a1-ddb0-463d-9057-55579e016290.png)](https://cta-redirect.hubspot.com/cta/redirect/2835452/7d7d32a1-ddb0-463d-9057-55579e016290)

## Don't Lose Your Competitive Advantage

## Follow Our Blog To Keep Pace With The Latest...

- Industry Standards
- Thought Leaders
- Ideas and Innovations
- Products and Services
- Guides and Practices

### Subscribe to Email Updates

### Recent Posts

### Posts by Topic

- [construction productivity (8)](https://blog.cpsgrp.com/nehp/topic/construction-productivity)
- [8 wastes of lean (6)](https://blog.cpsgrp.com/nehp/topic/8-wastes-of-lean)
- [lean construction (5)](https://blog.cpsgrp.com/nehp/topic/lean-construction)
- [value stream mapping (5)](https://blog.cpsgrp.com/nehp/topic/value-stream-mapping)
- [construction planning (1)](https://blog.cpsgrp.com/nehp/topic/construction-planning)
- [construction risks (1)](https://blog.cpsgrp.com/nehp/topic/construction-risks)
- [lean time management (1)](https://blog.cpsgrp.com/nehp/topic/lean-time-management)
- [modular construction (1)](https://blog.cpsgrp.com/nehp/topic/modular-construction)
- [non-utilized talent (1)](https://blog.cpsgrp.com/nehp/topic/non-utilized-talent)
- [offsite manufacturing (1)](https://blog.cpsgrp.com/nehp/topic/offsite-manufacturing)
- [overproduction (1)](https://blog.cpsgrp.com/nehp/topic/overproduction)
- [project delivery risk factors (1)](https://blog.cpsgrp.com/nehp/topic/project-delivery-risk-factors)

see all

- [Home](https://www.exentec.net/)
- [About](https://www.exentec.net/About-Us)
- [Contact](https://www.exentec.net/Contact)

 © 2026 Exentec

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "NEHP",
    "url" : "https://blog.cpsgrp.com/nehp/author/nehp"
  },
  "dateModified" : "2019-09-23T17:14:22.095Z",
  "datePublished" : "2018-10-11T15:49:55.000Z",
  "headline" : "Just In Time In Construction (JIT Delivery)",
  "image" : [ "https://blog.cpsgrp.com/hubfs/pexels-photo-544965.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://blog.cpsgrp.com/nehp/just-in-time-in-construction",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://blog.cpsgrp.com/hubfs/email_header_fti.png"
    },
    "name" : "Critical Process Systems Group"
  }
}
```