<img height="1" width="1" style="display:none;" alt="" src="https://dc.ads.linkedin.com/collect/?pid=237593&amp;fmt=gif">

NEHP Blog



8 Wastes of Lean Construction Part 4: Non-Utilized Talent

Posted by NEHP on Feb 12, 2019 12:57:00 PM

What is Non-Utilized Talent?

Non-Utilized Talent is a key waste described in the lean construction ideology. It is a waste that is often hidden behind more tangible ones such as defects, time and transportation. This waste pertains to the loss or incomplete use of human capability and resources within a production process.

Read More

Topics: 8 wastes of lean, non-utilized talent